Skip to main content

SLIM-Control/IBM Rational Team Concert Integration Manual

The SLIM to RTC integration can be configured to retrieve information about defects and other metrics from a RTC repository and insert that information into the actual data of a SLIM-Control workbook.  For more information and access, see the Integrations section of the Downloads page.