The SLIM to RTC integration can be configured to retrieve information about defects and other metrics from a RTC repository and insert that information into the actual data of a SLIM-Control workbook. For more information and access, see the Integrations section of the Downloads page.
Taxonomy upgrade extras
Interfacing to Other Applications