SLIM Suite 8.0g2 Is Now Available for Download

As our clients expand into new design disciplines, QSM recognizes their need for estimation, tracking, and benchmarking tools for domains outside of just software. Our goal with SLIM 8.0 has been to increase configurability within our tools so our clients can model any type of system quickly and easily. With SLIM Suite 8.0g2, QSM continues to expand our offerings to support different design processes and increase ease of use.

SLIM Suite.  An auto-update notification feature has been added to detect when a newer version of the SLIM Suite exists and is available for download. Enhancements have also been added so Export to PowerPoint now defaults to .pptx file format and Export to Word now defaults to .docx file format where appropriate.

SLIM-Estimate. An "Update My Project Milestones" button has been added to the WBS tab of the Work Breakdown Structure dialog box to give clients the option to replace existing project milestones defined on the Milestones tab of the Project Environment dialog box with milestones defined in the WBS. Two new SEW templates, "Call Center" and "Data Center," have been added, leveraging new Infrastructure trends.

SLIM-Metrics. A new feature has been added to File | Import Workbook Components > Reference Data tab, which allows clients to import a specific reference group (as opposed to importing all reference groups in the source workbook).

If you are a current SLIM Suite client and would like to get the latest upgrade, please contact QSM Support.